The substructure masonry has been constructed and the beam
and block floor installed. The demolition of the existing roof is taking place and
the external and internal walls are being constructed, as seen in the below
photo’s.
Following the Ground Breaking
Ceremony, which took place on the 30th April 2014, the ground has
been reduced in level to allow for the foundation footings to be dug and we are
currently pouring the 53m3 of concrete into them.
With the
site set-up now in place the construction works have now commenced on the
Stanfield Nursing Home Project and are off to a good start.